Gate valves are essential components in various industrial applications, particularly in pipelines where flow control is critical. The ISO 15761 standard specifies the requirements for steel gate valves used in petroleum, petrochemical, and related industries. This article provides an overview of the manufacturing process for ISO 15761 gate valves, highlighting key stages and quality considerations.

## Raw Material Selection

The manufacturing process begins with the careful selection of raw materials. ISO 15761 gate valves are typically made from carbon steel, stainless steel, or alloy steel, depending on the intended application and operating conditions. The material must meet specific chemical composition and mechanical property requirements outlined in the standard.

Key material considerations include:
– Chemical resistance
– Temperature tolerance
– Pressure rating
– Corrosion resistance

## Casting or Forging Process

The valve body, bonnet, and other major components are created through either casting or forging:

### Casting Method
1. Pattern creation
2. Mold preparation
3. Metal pouring
4. Cooling and solidification
5. Removal from mold
6. Cleaning and finishing

### Forging Method
1. Heating the raw material

2. Shaping under high pressure
3. Heat treatment
4. Machining to final dimensions

## Machining Operations

After the initial forming process, components undergo precision machining to achieve the required dimensions and surface finishes:

– CNC turning and milling
– Drilling and tapping
– Grinding and polishing
– Thread cutting for connections

## Assembly Process

The assembly stage brings together all manufactured components:

1. Installation of the gate (wedge or parallel)
2. Stem assembly
3. Packing and sealing components
4. Bonnet attachment
5. Final tightening and alignment

## Testing and Quality Control

ISO 15761 gate valves undergo rigorous testing to ensure compliance with the standard:

### Pressure Testing
– Shell test (1.5 times design pressure)
– Seat test (1.1 times design pressure)

### Functional Testing
– Operation torque check
– Leakage testing
– Full stroke operation verification

### Non-Destructive Testing (NDT)
– Ultrasonic testing
– Radiographic testing
– Magnetic particle inspection
– Liquid penetrant inspection

## Surface Treatment and Coating

To enhance durability and corrosion resistance, valves receive appropriate surface treatments:

– Shot blasting for surface preparation
– Painting or coating application
– Specialized treatments for harsh environments

## Final Inspection and Documentation

Before shipment, each valve undergoes final inspection:

– Dimensional verification
– Visual inspection
– Marking and tagging per ISO 15761 requirements
– Preparation of certification documents

## Packaging and Shipping

The completed valves are carefully packaged to prevent damage during transportation:

– Protective coatings
– Wooden crates or custom packaging
– Proper securing for international shipping

The ISO 15761 gate valve manufacturing process combines precision engineering with strict quality control measures to ensure reliable performance in critical applications. By adhering to this standardized process, manufacturers can produce gate valves that meet the demanding requirements of the petroleum and petrochemical industries.